Gaining the Corbel Edge – Mayfair Park, Lakewood, California

Nicholas Drake Blog, Stormwater

Project Lifecycle Day 4: Landing 16’ x 8’ x 10” slabs onto the jutting corbels of box culvert modular sections takes fortitude, finesse, and one of the best designs precast concrete has to offer. It’s a match made in Lakewood, California. Gaining the corbel edge means less concrete and more storage capacity for stormwater projects like the one being built in Mayfair Park. “Alternating between rows of box culvert and top/bottom slab sections reduces the amount of concrete per cubic foot required to attain a target storage capacity within a given three dimensional space,” says Vanessa Gallo, PE, Jensen Precast …